Projects

Rawafid Systems undertakes turnkey projects in Industrial, Civil Construction, Electrical and Telecommunications Sector that have helped us in establishing an amicable relationship with our clients. We have become collaborative, strategic partner to our clients by offering innovative and integrated solutions. Here is a cross section of work to give you an idea of the diversity of our services.

List of On-going Projects

1) Power Sector

SL.

PROJECT

SPECIFICATIONS

1

Transformer

High Voltage, 3 Phase, Oil Immersed out door

25/3/.5 MVA

2

Transformer

HV, 3 Phase, out door

30/20/20 MVA

3

Transformer

HV, 3 Phase, Oil Immersed

18/15 MVA

4

Transformer

HV, Oil Immersed, 2,830 KVA

5

Transformer

31.5MVA / HV/3 Phase, 60Hz/ HV:13.8KV/LV:7.2KV

6

Transformer

60MVA HV, 3 Phase, 60hZ / HV 230KV / LV: 7.2KV

7

Transformer

30/20/20MVA / HV / 3 Phase / 60Hz/ outdoor 15.75,6.9,6.9KV

8

Transformer

18/15MVA ( HV/3 Phase, 60Hz/ HV:13.8KV/LV:6.9KV

9

Transformer

Transformer, High voltage, 3-Phase
- Rated: 8/10 MVA
- Rated Frequency: 60HZ

10

Transformer

Transformer, High voltage, 3-Phase
- Rated: 12/15 MVA
- Rated Frequency: 60HZ

11

Transformer

Transformer, High voltage, 3-Phase- Rated: 89.25 MVA- Rated Frequency: 60HZ

12

Transformer

Transformer, High voltage, 3-Phase- Rated: 75/60 MVA- Rated Frequency: 60HZ

13

Transformer

Transformer, High voltage, 3-Phase
- Rated: 67/50MVA
- Rated Frequency: 60HZ


2) Electrical Sector

SL.

PROJECT

SPECIFICATIONS

1

Electric Motor

AC HV, 3-Phase, Squirrel Cage, 1420KW (10 Pole)

2

AC Motor

HV, 3PH, 2 Pole, Squirrel Cage for pump 2,800KW

3

Electric Motor

AC, HV, Industrial, 3 Phase, 2,950KW (4 Pole)

4

Electric Motor

AC, HV, Industrial, 3 Phase, 3,050KW (4 Pole)

5

AC Motor

Squirrel cage Motor, 3,050KW


3)Industrial Sector

SL.

PROJECT

SPECIFICATIONS

1

Feed Water Heater

U-tube Vertical Shell

Flow:643,464 kg/Hr(Water)

41,076 Kg/Hr(Steam)


4)Civil & Telecom Sector
Civil works is going on for more than 15 sites for Saudi Telecom Company - excavation, foundation and tower erection for Fixed GSM, CR, V7 projects is in progress.

Warehouse & Shelter - Civil works is on-going for MINISTRY OF EDUCATION at Hotat Bani Tamim in Riyadh, KSA

List of Completed Projects:
Civil And Telecom: We have done more than 25 sites for STC And Mobily (complete Civil construction and Telecom )

Industrial : Dismantling the old transformer of 75MVA/84MVA at the Jubail Plant and installing, testing & commissioning a new 75MVA transformer of ILJIN at SWCC Jubail Plant.

Other Projects:

SL.

PROJECT

SPECIFICATIONS

1

Transformer

High Voltage, 3 Phase, Oil immersed, outdoor

75/84 MWA

2

Transformer

30MVA TF Transformer, High voltage, 3-Phase
- Rated: 30MVA
- Rated Frequency: 60HZ

3

Transformer

2.83MVA Transformer, High voltage, 3-Phase Rated: 2.83MVA (2,830KVA)- Rated Frequency: 60HZ

4

Air Cooler for BRP Motor

145 KW, Shells Tube

5

Air Cooler for MCWP Motor

155KW, Shell & Tube